Stormwater Stormwater Program Projects
Bethlehem Township Municipal Authority has established a Stormwater Fee to fund its stormwater management program costs, including necessary improvements created by unfunded mandates in addition to short and long-term needs.

Winter, 2024 Stormwater Solutions
Fall, 2024 Stormwater Solutions


Stormwater - Pollutant Reduction Plan (PRP)
As part of the NPDES Permit requirements Bethlehem Township is implementing a series of BMPs throughout the Township. These BMPs will assist in managing stormwater runoff and reducing sediment loading entering our local waterways. Additional information can be found in the PRP linked below.

September, 2023 Pollutant Reduction Plan Amendments


Stormwater - Capital Improvement Plan (CIP)
The funds generated from the Stormwater Fee will be dedicated to the stormwater program and will include addressing flooding and meeting the stormwater requirements mandated by the Pennsylvania Department of Environmental Protection (PADEP). Construction of these projects began in 2023 for flood mitigation efforts in the areas of Walnut Street as well as detention basin retrofits in various places. Improvements in the area of Santee and Easton are also being planned.

Stormwater Capital Improvement Plan (July 2024)


Completed Projects

PRP PH 1 Basins and Bethman
PRP Phase 1 Basins

Fairway Storm Sewer Installation
Bethman and Fairway Storm Sewer Installation






© Bethlehem Township

Leave a Message
Welcome to the Bethlehem Township messaging system. Please fill out the form below and a representative will contact you within the next business day.

If this is a police, fire, or medical emergency dial 911. If this is a police or public safety non-emergency, please call Northampton County Dispatch at 610-759-2200.